Search Results

AQUATHERM DESIGN & PLANNING GUIDE

We are pleased to present the 2025 Design & Planning Guide, with many updates, including aquatherm blue® MF RP (PP-RCT). Read More

PLANNING GUIDE AND PARTS GUIDE

We’re excited to announce the release of the new Aquatherm Design & Planning Guide and its companion piece, the Aquatherm Parts Guide. Formally referred to as our Product Catalog, these Guides deliver updated information on planning and designing piping systems using North America’s preeminent polypropylene piping system. Read More

Found 337 Search Results

BUSY LAUNDRY FACILITY GETS MUCH NEEDED UPDATE WITH AQUATHERM GREEN PIPE

December 19th, 2011

Music City high rise hotel entrusts Demand Mechanical to connect new laundry equipment with aquatherm green Nashville, also known as ‘Music City,’ is home to the Grand Ole Opry, The Country Music Hall of Fame, and countless music venues where musicians from all over the world come to play, write songs, and sing tunes. With Read More

OVERCROWDED COUNTY JAIL FINDS BETTER VALUE WITH AQUATHERM

December 19th, 2011

“We picked it up pretty quickly, once I started seeing how it goes together, I was happy with aquatherm and okay with using it right from the beginning.” -Craig Thornock, Superintendent, Envision Mechanical, Ogden, UT

RADIANT HEATING SYSTEM PROVIDES UNIQUE SOLUTION FOR AIRPORT SERVICE HANGAR IN WINDSOR, ONTARIO

November 23rd, 2011

Hybrid design delivers significant space savings and simplifies PEX circuit layout and installation. Operated by the City of Windsor (Ontario) since 2007, Windsor Airport serves a mixture of scheduled airline flights and general aviation, and is a popular point of entry into Canada for private and business aircraft. In 2011, the City of Windsor identified Read More

ALASKA PRISON EMPLOYS AQUATHERM PRESSURE PIPE IN SEVERAL KEY SYSTEMS, INCLUDING WASTEWATER

October 23rd, 2011

“The fact that aquatherm didn’t have to be insulated and metal-jacketed made a big difference. In a wastewater or industrial facility where you have high moisture content, that’s a big deal. We didn’t have to insulate anything and it has such a clean look.” -Jeff Oliver, Chief Executive Manager, Southcentral Mechanical

NONTRADITIONAL PIPING OPTION SHINES IN HIGH SCHOOL RENOVATION

October 19th, 2011

Stroudsburg High School, in the Borough of Stroudsburg, PA, serves approximately 1,550 students in grades 10-12, with 110 professional staff members and 35 support staff. Located in the county seat of Monroe County, the high school offers a rigorous curriculum that challenges the students’ academic capabilities. The 132,890-square-foot school building was originally constructed in 1927, Read More

INNOVATIVE A/C MANUFACTURER INTEGRATES CUTTING-EDGE PIPE SYSTEM IN TRAINING FACILITY

October 19th, 2011

Daikin is the largest HVAC manufacturer in the world, with sales of $12 billion, and the company is making a dramatic impact in the HVAC market throughout North America. While the company does a lot of training at local independent distributors and online, they also have two U.S. physical training facilities. Training on the proper Read More

FAST-GROWING BREWERY TAPS EMERGING PIPE SYSTEM FOR CHILLED GLYCOL DISTRIBUTION

October 19th, 2011

Rapidly expanding, award-winning EPIC Brewing has adopted aquatherm’s PP-R as its pipe system of choice. Located in the heart of downtown Salt Lake City, EPIC Brewing Company has rapidly established itself as a cuttingedge, award-winning brewery. In fact, EPIC now brews 10 times its original capacity and is among the fastest growing breweries in North Read More

GREEN PIPING ALTERNATIVE EXCELS IN ARIZONA MEDIA BUILDING

August 19th, 2011

“The installation lasted approximately two weeks. If this had been a steel pipe installation it would have been three to four weeks to cut and thread pipe this size and then deal with weight issues.” -Jay Faraci, Owner of Metal Masters Mechanical LLC, Phoenix

POLYPROPYLENE PIPE HELPS EASE ELEMENTARY SCHOOL’S TRANSITION TO GEOTHERMAL

June 23rd, 2011

The Kent (WA) School District leveraged grant money to dramatically upgrade its heating system with an assist from aquatherm’s polypropylene pipe. Originally completed and opened in 1963, Park Orchard Elementary was part of the local school district’s plan to accommodate the growing population in Kent, WA. After undergoing various additions including extra wings and a Read More

VALUE ENGINEERING LEADS TO PIPING INNOVATIONS AT NEW FAU FOOTBALL STADIUM

June 19th, 2011

PP-R piping helps construction team beat tight timeline while saving roughly $120,000 on larger sized water piping materials and halving installation time on water mains and branch piping. Florida Atlantic University’s new football stadium is expected to open for the 2011 football season, bringing excitement and revenue to the campus and surrounding community. For the Read More

arrow_upward