CSU STAFF RE-PIPES DATA CENTER WHILE REMAINING OPERATIONAL WITH ASSIST FROM PP-R PIPE

Aquatherm’s PP-R material, which is bonded using heat fusion, provided a solution that was both fast and safe.

  • project overview

    arrow_drop_down
    project

    Colorado State University Data Center, HVAC

    products used

    Aquatherm Blue Pipe

    location / date

    Fort Collins, CO 2010

    Aquatherm Advantages
    • The heat fusion bonding process requires no open flames, solder, or glue
    • The PP-R material is considerably lighter than metal alternatives and required no crane for installation
    • The 10-year, multimillion dollar warranty provided confidence to university administration
  • project overview

    arrow_drop_down
    project

    Colorado State University Data Center, HVAC

    products used

    Aquatherm Blue Pipe

    location / date

    Fort Collins, CO 2010

    ""

    -

    Aquatherm Advantages
    • The heat fusion bonding process requires no open flames, solder, or glue
    • The PP-R material is considerably lighter than metal alternatives and required no crane for installation
    • The 10-year, multimillion dollar warranty provided confidence to university administration
Click anywhere to dismiss

The Challenge

The data center, which had been running since the 1960s, required an expansion and upgrade to the water-cooling system without rendering the servers inoperable.

The Solution

Aquatherm’s PP-R material, which is bonded using heat fusion, provided a solution that was both fast and safe.

“The number one reason we opted to use it on this project was the application inside the room. We couldn’t shut down the system and needed a product that could go under the floor, be reliable, and that didn’t require soldering or welding.”

– Gene Ellis, Mechanical Engineer, CSU Campus Facilities Management, Fort Collins, CO

 

Related Case Studies

Plastics experts select Aquatherm for new manufacturing facility

New process cooling system showcases flexibility, advantages of Aquatherm pipe

View Case Study

HAPPY AS A PIG? AQUATHERM PIPE EXCELS IN TOUGH AGRICULTURAL APPLICATION

Aquatherm Blue Pipe moves 1.2 million BTUs generated by five 399,000 Btu condensing boilers at this pig barn.

View Case Study

PP-R PIPE, PROTOTYPE FUSION MACHINE LEAVE NOTHING TO CHANCE AT SPECTACULAR NEW HOTEL AND CASINO

Aquatherm pipe in sizes ranging from ¾-in. to 24-in. was installed at the Seminole Hard Rock Hotel & Casino.