GOAL! AQUATHERM SCORES AT NEW WHL ARENA - Aquatherm

GOAL! AQUATHERM SCORES AT NEW WHL ARENA

The recently opened Mosaic Place is a multi-purpose arena in Moose Jaw, SK, and home to the Moose Jaw Warriors of the Western Hockey League. Also known as the Moose Jaw Multiplex, the 3-story, 19,509 m², multi-use facility features a 4,500-seat sports bowl, a large curling facility, and other amenities.

  • project overview

    arrow_drop_down
    project

    Mosaic Place Arena, HVAC and Domestic Water Distribution

    products used

    aquatherm blue, aquatherm green

    location / date

    Moose Jaw, SK/Spring 2011

    "The benefits of the aquatherm system were superior. It was easier to work with since it is lighter than steel or ductile iron."

    - Hermann Koechl, GML Mechanical Ltd., Delta, BC

    aquatherm Advantages
    • Polypropylene pipe weighs up to 80% less than comparably sized metal pipes, offering easier installation
    • The improved flow rate results in energy savings
    • The simple heat fusion process saved time on labor and helped meet the completion date
  • project overview

    arrow_drop_down
    project

    Mosaic Place Arena, HVAC and Domestic Water Distribution

    products used

    aquatherm blue, aquatherm green

    location / date

    Moose Jaw, SK/Spring 2011

    "The benefits of the aquatherm system were superior. It was easier to work with since it is lighter than steel or ductile iron."

    - Hermann Koechl, GML Mechanical Ltd., Delta, BC

    aquatherm Advantages
    • Polypropylene pipe weighs up to 80% less than comparably sized metal pipes, offering easier installation
    • The improved flow rate results in energy savings
    • The simple heat fusion process saved time on labor and helped meet the completion date
Click anywhere to dismiss

The Challenge

A tight deadline required quick and easy installation on a large scale with LEED certification as a goal

The Solution

aquatherm’s light weight helped speed the installation and the product’s eco-friendly benefits were also well received

The recently opened Mosaic Place is a multi-purpose arena in Moose Jaw, SK, and home to the Moose Jaw Warriors of the Western Hockey League. Also known as the Moose Jaw Multiplex, the 3-story, 19,509 m², multi-use facility features a 4,500-seat sports bowl, a large curling facility, and other amenities.

Projects of this scale always pose a challenge, especially when built to rigorous standards. Operated by the Mosaic Company and designed with LEED silver certification in mind, the arena was built to represent Moose Jaw with a world-class facility.

The entire project required special attention to detail, and many options were considered for the piping. It was determined that aquatherm’s polypropylene-random (PP-R) pressure pipe would be the material of choice for the domestic water and HVAC distribution throughout the arena.

GML Mechanical Ltd., a mid-size, full-service contractor located in Delta, BC, partnered with Ventana Construction Corp. as the design build plumbing and mechanical contractor on the job, while Sterling Cooper & Associates served as the mechanical engineer.

“We’ve worked with aquatherm for the last four years, and have done several projects in Vancouver, so when this project came up and involved 8- and 10-inch pipe for the condenser water/glycol loop, we decided to use aquatherm,” said GML Project Manager Hermann Koechl.

Immediate Advantages

Immediately, the advantages over using traditional materials were noticed. While steel and copper were considered, “The benefits of the aquatherm system were superior. It was easier to work with since it is lighter than steel or ductile iron,” Koechl added.

In fact, PP-R piping weighs up to five times less than similarly sized metal materials, which can lead to savings in time and energy used during installation as well as less stress on the system supports.

Large diameter metal pipes also require a variety of tools to install properly. aquatherm’s products are installed through a simple heat fusion process which bonds both sides of a joint into a single, homogenous material without the use of flames, chemicals, or mechanical connections. Simply putting a piece of pipe and a fitting on opposite ends of an aquatherm welding device for the specified amount of time (about 10 seconds for the 4” pipe), and then joining them together creates an incredibly strong connection. Pipes larger than 4” require a butt fusion method that uses the same principle with very similar equipment.

In addition to the relative lightness of polypropylene, aquatherm offers many other advantages over traditional piping materials including 100 percent recyclability down to the joints, non-leaching properties that will not release debris or affect the taste of water, and a 10-year multimillion dollar warranty to back up the product.

R.N.G. Marketing Inc. in Regina provided local assistance for GML and worked extensively with the City of Moose Jaw, provincial and local inspectors, and labour relations to ensure that everyone was onboard. GML, with the assistance of Doug Johnson, Account Manager for EMCO Corporation’s Richmond, BC office, was able to purchase and ship directly from Germany to the site, a container full of pipe and fittings, which reduced handling and provided a convenient site storage container for the large pipe order. The Regina Branch provided the remainder of the product for the project.

Meeting the Deadline while Saving

Approximately 6,000m of aquatherm Climatherm and Greenpipe® ranging from 20mm to 250mm was used for the facility’s domestic hot and cold water as well as for the heating/cooling loops. “We were pleased to have met the challenging completion date, and the use of aquatherm helped to keep the tight deadlines with the available manpower on hand,” Koechl concluded. And the labor and material savings, combined with stable prices didn’t hurt either.

Related Case Studies

The Data are In: ‘Hyperscale’ Data Center Selects Reliable Aquatherm Pipe

aquatherm blue plays a key role in ensuring the data in the new Novva “hyperscale” data center stays cool and secure.

View Case Study

POLYPROPYLENE PIPING PERFECT FOR PREFABBED PLUG-AND-PLAY ‘PODS’

Thanks to its light weight, ability to be custom-fabricated off site, and availability as Revit files, aquatherm pipe is an integral part of Harvey Plumbing & Heating’s modular mechanical room “pods.”

View Case Study

AQUATHERM HELPS GROWING HOSPITAL REACH FOR THE (BIG) SKY

aquatherm blue® and aquatherm green® will handle chilled and domestic water at three-story ICU expansion

View Case Study

AQUATHERM PIPE BRINGS NEW LIFE TO SOUTHERN LANDMARK

A contractor’s first installation of aquatherm brings 21st century pipe to a 1925 structure

View Case Study