GREEN PIPING ALTERNATIVE EXCELS IN ARIZONA MEDIA BUILDING - Aquatherm

GREEN PIPING ALTERNATIVE EXCELS IN ARIZONA MEDIA BUILDING

Blue Pipe was installed to provided labor savings and eased installation.

  • project overview

    arrow_drop_down
    project

    Arizona Republic news and broadcast station, Chilled Water Retrofit

    products used

    Aquatherm Blue Pipe

    location / date

    Phoenix, AZ August 2011

    Aquatherm Advantages
    • The limited installation space was a non-issue since the pipe was able to be downsized thanks to its superior flow rate
    • Blue Pipe weighs up to 75% less than comparably sized metal pipes making the installation much easier
    • The corrosion-resistant and leak-free PP-R pipe is engineered to last over 60 years
  • project overview

    arrow_drop_down
    project

    Arizona Republic news and broadcast station, Chilled Water Retrofit

    products used

    Aquatherm Blue Pipe

    location / date

    Phoenix, AZ August 2011

    ""

    -

    Aquatherm Advantages
    • The limited installation space was a non-issue since the pipe was able to be downsized thanks to its superior flow rate
    • Blue Pipe weighs up to 75% less than comparably sized metal pipes making the installation much easier
    • The corrosion-resistant and leak-free PP-R pipe is engineered to last over 60 years
Click anywhere to dismiss

The Challenge

New 4-inch main and 3-inch supply lines were required in tight spaces to serve WHSP and chiller units for the data center and A/C system.

The Solution

Blue Pipe was installed to provided labor savings and eased installation.

“The installation lasted approximately two weeks. If this had been a steel pipe installation it would have been three to four weeks to cut and thread pipe this size and then deal with weight issues.”

-Jay Faraci, Owner of Metal Masters Mechanical LLC, Phoenix

Related Case Studies

Plastics experts select Aquatherm for new manufacturing facility

New process cooling system showcases flexibility, advantages of Aquatherm pipe

View Case Study

HAPPY AS A PIG? AQUATHERM PIPE EXCELS IN TOUGH AGRICULTURAL APPLICATION

Aquatherm Blue Pipe moves 1.2 million BTUs generated by five 399,000 Btu condensing boilers at this pig barn.

View Case Study

PP-R PIPE, PROTOTYPE FUSION MACHINE LEAVE NOTHING TO CHANCE AT SPECTACULAR NEW HOTEL AND CASINO

Aquatherm pipe in sizes ranging from ¾-in. to 24-in. was installed at the Seminole Hard Rock Hotel & Casino.

View Case Study

A PEACH OF A PROJECT

The 22-story Windsor Over Peachtree condominium building features commanding views of downtown Atlanta and the surrounding area. Aquatherm pipe in place at Windsor Over Peachtree. Its virtually leak-free performance impressed the installing contractor.

View Case Study

arrow_upward